Manufacturing is where ERP delivers some of its biggest benefits, and where poor training causes some of the most expensive mistakes.
A trading business buys and sells finished goods. A manufacturer turns raw materials into products, with labour, machines, wastage and overheads in between. If any part of that process is recorded wrongly in the ERP:
Product costs are wrong
Selling prices are set on wrong numbers
Raw material stock never matches the store
Work in progress sits in the books forever
Profit looks better or worse than reality
Both ERPNext and Odoo have strong manufacturing modules. But the software can only calculate correctly if production planners, storekeepers, supervisors and cost accountants enter the right data at the right time. This guide explains the core manufacturing concepts, how they work in each ERP, the most common mistakes and why manufacturing training matters.
Note: features and labels vary by version and edition. Some advanced Odoo manufacturing features, such as PLM and the Master Production Schedule, are Enterprise features. The concepts below apply to both systems.
The manufacturing flow in an ERP
Whatever you make, whether textiles, plastics, food, chemicals, packaging, furniture or pharmaceuticals, the ERP flow is broadly the same:
Bill of Materials (BOM): what goes into the product
Operations and work centres: how and where it’s made
Production planning: what to make, how much and when
Work order / manufacturing order: the instruction to produce
Material issue: raw materials moved to production
Production and job tracking: operations performed and time recorded
Finished goods receipt: products added to stock
Scrap, by-products and wastage: recorded properly
Costing: actual cost calculated and posted to accounts
Key terms in ERPNext and Odoo
Concept | ERPNext | Odoo |
|---|---|---|
Recipe or structure | BOM (Bill of Materials) | Bill of Materials |
Where work happens | Workstation | Work Center |
Production steps | Operations, Routing | Operations (on the BOM) |
Planning | Production Plan | Replenishment / reordering rules, MPS (Enterprise) |
Production instruction | Work Order | Manufacturing Order |
Operation tracking | Job Card | Work Orders (operations), Shop Floor (newer versions) |
Material movement | Stock Entry (Material Transfer for Manufacture, Manufacture) | Component consumption on the Manufacturing Order |
Work in progress | WIP warehouse | Production location |
Outsourced production | Subcontracting Order / Receipt | Subcontracting BOM type |
Quality | Quality Inspection | Quality app |
Kits sold as sets | Product Bundle | Kit BOM type |
Reverse production | Disassemble or repack (depending on version) | Unbuild Order |
1. Bills of Materials: get them right first
The BOM is the foundation of everything in manufacturing. It defines:
Components (raw materials) and quantities per unit or per batch
Operations and the time each takes
Scrap or by-products, where relevant
Quantity produced by the BOM (for example, one BOM for 500 units)
What production staff must understand
Units of measure: kg vs grams, metres vs yards, cartons vs pieces
Batch BOMs vs per-unit BOMs: a BOM for 1 unit vs 500 units
Multi-level BOMs: sub-assemblies with their own BOMs (for example, a chair frame used in a finished chair)
Alternate or versioned BOMs: different recipes for different machines or periods
Default BOM: which BOM the system uses automatically
Wastage and process loss: include it realistically, don’t ignore it
The most damaging mistake: BOMs created once at go-live and never updated when recipes, suppliers or processes change. Every product cost after that is wrong.
2. Work centres, operations and routing
Workstations (ERPNext) and Work Centers (Odoo) represent machines, lines or teams. Each can have:
Cost per hour: electricity, labour, depreciation and overheads
Capacity and working hours
Setup time (in some configurations)
Operations define the steps: cutting, moulding, stitching, mixing, filling or packing. Each operation has a time per unit or batch on a specific work centre.
Why it matters: if operations and work centre rates aren’t set up, the ERP only costs materials, and your products look cheaper than they really are.
3. Production planning
ERPNext | Odoo |
|---|---|
Production Plan: pull demand from sales orders or material requests, then create work orders and raw material requests | Replenishment and reordering rules: create manufacturing orders when stock falls below minimum. MTO (make to order) routes create orders from sales. MPS (Enterprise) for longer-range planning |
Planners must understand:
Make-to-stock vs make-to-order
Raw material availability before releasing orders
Sub-assembly planning in multi-level BOMs
Lead times and capacity
4. Work orders and manufacturing orders
The Work Order (ERPNext) or Manufacturing Order (Odoo) is the instruction to produce a quantity using a specific BOM.
Typical ERPNext flow:
Create the Work Order from the BOM or Production Plan
Transfer materials to the WIP warehouse (Material Transfer for Manufacture)
Track operations with Job Cards (time, operator, quantity)
Record Manufacture: consume materials and receive finished goods
Complete the Work Order
Typical Odoo flow:
Create and Confirm the Manufacturing Order
Check availability of components
Process work orders (operations), recording time
Record consumed quantities and produced quantity
Mark as Done: components consumed, finished goods received
Key settings to understand:
Backflushing (ERPNext): consume materials based on the BOM or on what was actually transferred
Consumption flexibility (Odoo): whether actual consumption can differ from the BOM, and whether a warning appears
5. Scrap, by-products and process loss
Real production is never perfect:
Scrap: rejected materials or products
By-products: secondary outputs with value
Process loss: evaporation, trimming, shrinkage
These must be recorded properly. If wastage isn’t recorded:
Raw material stock in the ERP stays higher than reality
Finished goods cost less on paper than they really do
Stock counts show unexplained differences
6. Quality control
Both ERPs support quality checks at receipt, during production and before dispatch. For regulated industries such as pharma and food, quality records and batch traceability are essential. See GS1 DataMatrix and DRAP Serialization.
7. Subcontracting (job work)
Many manufacturers send work outside, such as dyeing, printing, stitching or packing. ERPNext uses Subcontracting Orders and Receipts, and Odoo uses subcontracting BOMs. Training should cover:
Sending raw materials to the subcontractor
Receiving finished or semi-finished goods
Recording the service charge
Tracking materials held at the subcontractor’s site
Common in textiles. See Textile and Garment ERP in Pakistan.
Production costing: a worked example
Product: plastic chair. Batch: 500 chairs.
Material cost per chair
Component | Qty per chair | Rate (PKR) | Cost (PKR) |
|---|---|---|---|
Plastic resin | 2 kg | 400 / kg | 800 |
Colourant | 0.1 kg | 1,000 / kg | 100 |
Packing material | 1 set | 50 | 50 |
Material cost | 950 |
Operation cost per chair
Operation | Time per chair | Work centre rate | Cost (PKR) |
|---|---|---|---|
Moulding | 6 minutes | PKR 1,200 / hour | 120 |
Total cost per chair | 1,070 |
Batch of 500 chairs
PKR | |
|---|---|
Materials (500 × 950) | 475,000 |
Operations (500 × 120) | 60,000 |
Finished goods value | 535,000 |
The accounting entry (simplified)
When production is completed with perpetual inventory:
Account | Debit | Credit |
|---|---|---|
Finished Goods Stock | 535,000 | |
Raw Material Stock (or WIP) | 475,000 | |
Operating / overhead cost absorbed in valuation | 60,000 |
In ERPNext, operating and additional costs on the Manufacture entry are typically credited to an account such as Expenses Included In Valuation. In Odoo, work centre costs flow into product cost, and accounting depends on your valuation settings. Your accountant should confirm the account mapping.
What happens when costing data is wrong
Error | Effect on cost per chair |
|---|---|
Resin quantity in the BOM is 1.8 kg, but 2 kg is actually used | Cost understated by PKR 80 |
Moulding operation not set up | Cost understated by PKR 120 |
Wastage not recorded | Raw material stock overstated, cost understated |
Old resin rate never updated | Cost wrong every batch |
Result: the chair may look like it costs PKR 870 when it really costs PKR 1,070. At a selling price of PKR 1,100, you think you’re making PKR 230 per chair, but you’re only making PKR 30.
That’s why manufacturing training isn’t optional.
The 10 most common manufacturing mistakes in ERPs
# | Mistake | What goes wrong |
|---|---|---|
1 | BOMs never updated | Costs drift away from reality |
2 | Wrong units of measure in BOMs | Consumption off by large factors |
3 | Operations and work centre rates missing | Products cost only materials, so margins are overstated |
4 | Production recorded at month-end in bulk | Stock wrong all month, planning unreliable |
5 | Materials issued without a work order | Consumption can’t be traced to products |
6 | Actual consumption differs from the BOM but isn’t recorded | Raw material stock doesn’t match the store |
7 | Scrap and process loss ignored | Hidden wastage, wrong costs |
8 | Work orders left open | WIP balances never clear |
9 | Sub-assemblies not produced in the system | Finished goods consume stock that “doesn’t exist” |
10 | Subcontracted materials not tracked | Stock at the subcontractor is lost in the books |
For stock-related problems, see ERP Inventory and Warehouse Training. For general ERPNext errors, see 12 Common ERPNext Mistakes Beginners Make.
Who needs manufacturing ERP training?
Role | Training focus |
|---|---|
Production planners | BOMs, production plans, work orders, capacity, material availability |
Storekeepers | Material issue, WIP transfers, finished goods receipt, returns of excess material |
Production supervisors | Job cards and work orders, time recording, scrap and quality |
Cost accountants | Work centre rates, overheads, costing methods, WIP and variance review |
Quality staff | Inspections, batch records, rejections |
Purchase team | Raw material planning, subcontracting |
Management | Production reports, cost analysis, margins by product |
Cost accountants should also read ERP Accounts and Finance Training and Why Accounting Training Is Essential for Reliable ERP Data. Labour costs link to payroll. See ERP HR and Payroll Training.
Monthly manufacturing checklist
☐ Review BOMs for recipe, rate or process changes
☐ Update work centre cost rates if electricity, labour or overheads changed
☐ Ensure all production is recorded daily, not in bulk
☐ Close completed work orders
☐ Investigate open work orders and WIP balances
☐ Record scrap, by-products and process loss
☐ Compare actual vs standard consumption for key products
☐ Reconcile raw material, WIP and finished goods stock with physical counts
☐ Review subcontractor stock
☐ Review product costs and margins with management
Industries that benefit most
Textiles and garments: see Textile and Garment ERP
Food and beverages: recipes, batches, expiry
Plastics and packaging: moulding, printing, conversion
Chemicals and coatings: formulas, batch production
Pharmaceuticals: batch records, quality, serialisation
Furniture and fabrication: multi-level BOMs, job work
LPG and filling plants: see LPG Plant and Gas Cylinder Business Software
For implementation, see Bizloom’s ERP for Manufacturing and How Odoo and ERPNext Help Growing Businesses Scale with Process Automation.
Career opportunities in ERP manufacturing
Manufacturing ERP skills are especially valuable because fewer consultants understand production deeply:
Production planning executive (ERP)
Cost accountant (ERP-based)
ERP manufacturing functional consultant
Supply chain and MRP specialist
Freelance manufacturing setup (BOMs, routings, costing)
See How to Become an ERPNext or Odoo Consultant and ERP Jobs for Fresh Graduates in Pakistan.
Learn ERP manufacturing with Bizloom Academy
Bizloom Academy is run by a team that implements ERPNext and Odoo for manufacturers, including textiles, packaging, chemicals and LPG, so our training is built on real factory scenarios.
For manufacturing teams (corporate training):
Quote-based training for planners, storekeepers, supervisors and cost accountants
Live online sessions, so teams at different plants or offices can join together
Individual training accounts for every participant
Practical scenarios: BOMs, work orders, WIP, scrap, subcontracting and costing
For individuals:
Course | Live sessions | Fee |
|---|---|---|
6 | PKR 10,000 | |
10 | PKR 25,000 | |
Functional Consultant Program (4 courses) | 26 | PKR 40,000 (instead of PKR 65,000) |
Live, instructor-led online classes, 60 minutes each
Your own training account
Case studies, assignments and a practical assessment
Learning support after the course
Pay in two instalments, or save 5% by paying in full
48-hour money-back guarantee after your first live session (see policy)
Product costs don’t look right? Book a free ERP assessment and we’ll review your BOMs, routings and costing setup.
Explore Bizloom Academy | WhatsApp us
FAQs
1. What is a Bill of Materials (BOM) in an ERP?
A BOM lists the raw materials, quantities and operations needed to make a product. It’s the foundation for planning, material consumption and costing.
2. What is the difference between a Work Order in ERPNext and a Manufacturing Order in Odoo?
They serve the same purpose: an instruction to produce a set quantity of a product using a specific BOM, consuming components and receiving finished goods.
3. How is production cost calculated in ERPNext and Odoo?
Mainly from component costs plus operation costs (time × work centre rate), along with any additional costs configured. Accurate BOMs and rates are essential.
4. Why are my manufactured product costs wrong?
Common causes are outdated BOMs, missing operations or work centre rates, wrong units of measure, unrecorded scrap and actual consumption differing from the BOM.
5. What is WIP in ERP manufacturing?
Work in progress is the value of materials and costs in production that aren’t yet finished goods. Open work orders keep WIP balances open.
6. Can ERPNext and Odoo handle subcontracting?
Yes. ERPNext uses Subcontracting Orders and Receipts, and Odoo uses subcontracting BOMs, to track materials sent out and goods received back.
7. Who in a factory needs ERP manufacturing training?
Production planners, storekeepers, supervisors, cost accountants, quality staff, purchasing and management, each focused on their role.
8. Can Bizloom train our factory team online?
Yes. Our corporate training is live online, so teams at different plants or offices can join the same sessions.